Search Forum
Blog Entry# 1755017
Posted: Mar 02 2016 (11:10)
5 Responses
Last Response: Mar 02 2016 (11:44)
5 Responses
Last Response: Mar 02 2016 (11:44)
IR should decide the criteria for declaring any train as SUPER FAST. There should be some parameters to put this "super fast" tag. Passengers unnecessary paying Super-fast charges to slow and late trains.
In my point of view, A trains should be declare as super fast if
1. Average Speed >60 or 65
2. Max stoppage between source and destination should not...
more...
In my point of view, A trains should be declare as super fast if
1. Average Speed >60 or 65
2. Max stoppage between source and destination should not...
more...
1. Can be done.
2. Not possible else trains like Coromandel express would get downgraded to express.
Similar with long distance trains like Kerela Express
3. Even rajdhanis get delayed over an hour. Hence not possible in any case.
4....
more...
2. Not possible else trains like Coromandel express would get downgraded to express.
Similar with long distance trains like Kerela Express
3. Even rajdhanis get delayed over an hour. Hence not possible in any case.
4....
more...
You Missed out Poorest 12501/02 & 15601/02 SCL/GHY NDLS Poorvottar Sampark Kranti Express has zero marks in punctuality, still taking charges for SF and Stops at Every Stoppage after KIR while Going to NDLS and back NDLS to KIR is Stoppage is Higher then it's Proposed Stoppages.
Look nfr is a special zone.
It should get some concessions.
Look at the challenges it faced.
The standards asked by him are just too high.
If IR follows his standards strictly then two of...
more...
It should get some concessions.
Look at the challenges it faced.
The standards asked by him are just too high.
If IR follows his standards strictly then two of...
more...