Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

22222/22221-->Aapli Rajdhani, Asli VIP number waali - Somanko

Search Forum
<<prev entry    next entry>>
Blog Entry# 1786173
Posted: Mar 31 2016 (21:20)

9 Responses
Last Response: Apr 07 2016 (21:54)
General Travel
5315 views
0

Mar 31 2016 (21:20)   VEER/Veer (2 PFs)
 
Rameez Shaikh~
Rameez Shaikh~   217 blog posts
Entry# 1786173            Tags  
Trains always halt at Veer for crossing and overtaking. Why next and previous stations like Goregaon Road and Sape Wamane are still halt stations? If second track is laid there, they can also be used for crossing and overtaking. They are required as proper stations with multiple lines and auto signalling system.
Translate to English
Translate to Hindi

6 Posts

2732 views
0

Apr 03 2016 (18:02)
Rameez Shaikh~   217 blog posts
Re# 1786173-7              
Please find screen grab taken from IR's NTES. Right side figures show distances in kms. I was referring kms from NTES and not from KR site.
Translate to English
Translate to Hindi

2956 views
0

Apr 03 2016 (18:18)
Rameez Shaikh~   217 blog posts
Re# 1786173-8              
Anyways, KR is planning doubling on Roha - Veer stretch in next three years. Work might start from next month. So, let's see. But, I feel halting at Veer can be reduced by laying loop line at Sape Wamane.
Translate to English
Translate to Hindi

2585 views
0

Apr 03 2016 (23:46)
Vinay Kumar   23030 blog posts
Re# 1786173-10              
Halting b reduced @ Veer but thn @ next station!!
Do u think, IR shld induce stations in between current stations with distance exceeding 15-20 kms?? Or to invest on Halts for Loops??
PS: The real distance will come out after deduction of 15% with current NTES KMs...
Translate to English
Translate to Hindi

2616 views
0

Apr 07 2016 (21:54)
Rameez Shaikh~   217 blog posts
Re# 1786173-11              
KR is coming up with 11 new stations. Asurde, kadwai, Chinchavali, bordave will be from Maharashtra. Mayem, Neura and Sarzora will be from Goa. Construction of already declared saundal hault will be started soon. It will be made a proper station. Fund of 25cr will be required for its upgradation. Veravali Halt is built in 1cr. But, no such news came whther it will also be made a proper station or not. I think all other stations also might be halt station to start with. But, I feel Veer, Sangameshwar, Nandgaon Road and Verna are stations where trains mostly await signal. So, halt stations around them need to be upgraded.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy