Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Vaishali Express - जितना सुंदर तुम्हारा नाम उतनी सुंदर तुम्हारी चाल - be my valentine - Rahul Vatsa

Search Forum
<<prev entry    next entry>>
Blog Entry# 2047292
Posted: Nov 03 2016 (23:07)

16 Responses
Last Response: Nov 07 2016 (17:14)
Poll
6228 views
20 votes
0

Nov 03 2016 (23:07)  
ps14003
ps14003   238 blog posts
Entry# 2047292              
According to Financial express, Talgo, the Spanish manufacturer of high-speed trains, is all set to lease out 2-5 trains to Indian Railways in less than a year’s time. Sources with knowledge of the matter told FE Online, that Suresh Prabhu-led Indian Railways is awaiting a final approval of Niti Aayog, before officially telling Talgo to lease out its trains to India. Once the contract is signed, it will take Talgo less than a year to supply anywhere between 2-5 trains. “The train is likely to be of around 26 coaches each, so that the total capacity matches that of the existing Shatabdis,” sources told FE Online.
Possible routes ------
Translate to English
Translate to Hindi
NO vote
Delhi - Mumbai
65%
13
Delhi - Amritsar
0%
0
Mumbai - Ahemdabad
10%
2
Delhi - Lucknow/Jaipur/Bhopal/Chandigarh
25%
5

1 Public Posts - Thu Nov 03, 2016

13 Public Posts - Sun Nov 06, 2016

1 Public Posts - Mon Nov 07, 2016

2064 views
0

Nov 07 2016 (17:14)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 2047292-16              
It will be a rather fine line when it comes to the earnings. The train capacity may decrease by moving to a Talgo rake. But at the same time there would be considerable savings in Energy and maintenance costs ( Talgo is projecting about 30%, but it will be less that that). With that included, the earnings may not take a big hit.
Talgo may not be a viable alternative at the outset for the Mumbai Raj, or the Bhopal Shatabdi due to the loss in capacity. But it will be a better alternative for many of the Shatabdi's running on non-high speed routes like MYS/SBC-MAS, Pune-SC etc.
...
more...
Actually a huge capital investment would be required for upgrading routes to run the Mumbai raj at 160kmph. For the HWH and Mumbai routes alone, IR has projected an estimate of 10,000 cr for upgrading the routes to be 160kmph fit as it would require actual relaying of tracks, changes in alignment in some places and many more large scale works to enable the long, heavy rakes to run at high speeds. It is not a short term project.
On the contrary, Talgo rakes will require a much smaller expenditure ( for initial rake purchase and setup of maintenance facilities) and can be used on any of the trunk routes and most of the important non-high speed routes with very minor modifications on these routes. They can run at higher speeds on existing routes and will reduce maintenance and energy costs considerably.
But Talgo is only a short term solution.More importantly, the LHB technology itself is now over 25 years old and stainless steel coaches worldwide have been replaced with more efficient, lighter aluminum and alloy coaches. By the turn of the decade, IR will have to move to these newer ones to reduce operational costs ( and the savings it would get are considerable). Trying out Talgo rakes would go a long way to help IR to transition in to the next generation.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy