The South Western Railway (SWR) has taken up the work of constructing the third entrance for the Krantiveera Sangolli Rayanna (KSR) City Railway Station in Majestic....
3 Public Posts - Sat Nov 05, 2016
1 Public Posts - Sun Nov 06, 2016
Linking the two routes at SBC station is now an almost impossible task. With the current platform locations, there isn't enough space to construct a track connecting the two as the required alignment for connecting 8-10 to the MAS side passes through the industrial establishment outside SBC station. Connecting the YPR route to PF 1-7 is even more difficult currently due to the rather sharp curve taken by the MAS route right before SBC.
For connecting both routes at SBC station, PF's 8-10 will have to be moved southwards by almost a third of their length, which is a cumbersome task that SWR will surely never take up. Joining both routes at SBC could have been possible...
more...
For connecting both routes at SBC station, PF's 8-10 will have to be moved southwards by almost a third of their length, which is a cumbersome task that SWR will surely never take up. Joining both routes at SBC could have been possible...
more...
4 Public Posts - Mon Nov 07, 2016