Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

नहीं कोई गम, रेलवे से हैं हम - Aman

Search Forum
<<prev entry    next entry>>
Blog Entry# 2058828
Posted: Nov 13 2016 (21:38)

11 Responses
Last Response: Nov 14 2016 (16:23)
Rail News
6505 views
2

IR Affairs
Nov 13 2016 (21:27)   B’luru-M’luru train ride to be shorter by 90 minutes

RFIR~   569 news posts
Entry# 2058828   News Entry# 285587         Tags   Past Edits
There’s some good news for passengers travelling between Bengaluru and Mangaluru by
train....

9 Public Posts - Sun Nov 13, 2016

1 Public Posts - Mon Nov 14, 2016

4269 views
0

Nov 14 2016 (16:23)
I.R.needrejuvenation~
I.R.needrejuvenation~   1946 blog posts
Re# 2058828-11              
(1) Why polishing a dining table and taking pride when its legs are creaking!!
(2) Instead of attacking at the root cause of the problem i.e. doubling or increasing the sectional capacity of the Hasan-Mangalore section, specifically the ghat section, the new line will serve no significant purpose for the Mangalore bound traffic, as introduction of new trains (possible after de-bottlenecking the Hasan-Mangalore section) is the primary requirement.
(3) Slow speed and poor sectional capacity is a result of a myopic thinking of IR in early 1990s, to any how do
...
more...
very rapid gauge conversion (for political mileage) with limited funds available, by compromising heavily on quality and safety parameters like, not going for straightening of track necessary for broadening of tracks in hilly sections, modernisation of signalling and adequate strengthening of foundation and tracks. As a result the gauge converted tracks could not give enough augmentation to the number of trains on the section and enough increase in the speeds/avg. speeds of the trains running on converted BG. MR wanted to complete the projects within its tenure to reap full electoral benefits and carried the job at break neck speed resulting in compromise with quality and safety.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy