Posted: Dec 23 2016 (21:55)

21 Responses
Last Response: Jan 05 2017 (00:25)
General Travel
36920 views
22

★★★
Dec 23 2016 (21:55)   12670/Ganga Kaveri Express (PT) | JBP/Jabalpur (7 PFs) | ET/WDP-4B
~   642 blog posts
Entry# 2102196            Tags   Past Edits
#ETALDELECTRIFICATION
In a nutshell, I've closely identified the progress of electrification work between Jabalpur and Itarsi. The details are given below.
1. Jabalpur (excl.)-Narsinghpur work is almost done. Wiring is complete. Work left is only on the two bridges over Narmada river. I think they are deciding to electrify KEQ-JBP at the end. Pic is given in my trip blog.
2. The pic
...
more...
no. 1 & 2 gives the good news we all have been waiting for. The final section i.e, Kareli-Pipariya work has started. Holes have been dug from Gardarwara till Pipariya. You can see works-man digging holes for poles. Soon they'll reach Kareli.
3. Pipariya station is completely under wires now. Pics 3,4,5 shows the status. Wiring from PPI-BGRT is done. At few poles it is to be tightened. I've seen works-man tighten the wires, but due to immense speed of the train (thanks to ET shed monster WDP4b :p ) i couldn't capture those instants. Pics- 8,9 shows BRGT station status.
4. The only single line section of ET-ALD route i.e, BRGT-SQL has also begun to come under wires. Poles and wires are installed and only tightening needs to be done. Pics 9,10,11 are evident. Even bridge over TAWA river is getting poles to be installed.
5. The section after SQL is completed. Only tightening of wires is left at 4-5 poles.
Work is going on at decent pace. CORE is all set to trail the electrified section of ET-PPI in January and is working on that. I hope that was useful :)

Translate to English
Translate to Hindi

7 Public Posts - Fri Dec 23, 2016

4 Public Posts - Sat Dec 24, 2016

4603 views
2

Dec 24 2016 (15:47)
rohit04u   27 blog posts
Re# 2102196-12              
This is a big and owesom news update that work progress has started between gadarwada and pipariya it was not expected anytime soon i lost hope of any progress till 2018 but it looks like we are going to have itarsi jabalpur electrified line very soon really u have made an awesome update today waiting for this kind of update from a very very long time
Aapka bahaut bahaut shukriya thanks a lot please keep updating work between gadarwada and pipariya bcoz only this section was having no work started
Thanks
...
more...
a lot for ur update

Translate to English
Translate to Hindi

1 Public Posts - Sat Dec 24, 2016

2 Public Posts - Sun Dec 25, 2016

2 Public Posts - Mon Dec 26, 2016

2 Public Posts - Wed Jan 04, 2017

2 Public Posts - Thu Jan 05, 2017
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy