Search Forum
Blog Entry# 2153494
Posted: Feb 06 2017 (15:21)
1 Responses
Last Response: Feb 06 2017 (15:21)
1 Responses
Last Response: Feb 06 2017 (15:21)
Rail Budget
SECR/South East Central
Diwakar Pandey 3 news posts
रेल लाइनों पर केंद्रित और आम यात्री के लिए उदासी भरे बजट में उन सुविधाओं को तलाशा गया जो तत्काल न सही लेकिन आने वाले समय...
read more... SO BSP LOCO SHED IS A REALITY NOW
BSP-NGP 410 km is proposed for SHS train(160kmph). A substantial portion of this route is to be barricaded for safe operation of SHS. It is reported that Rs. 16.35 crore required for barricading of BSP-Durg track. For BSP-NGP the figure should be about 50 Crores. 1.13 crore allocation is too low for any significant progress in barricading.
-
One more factor, the more important one than barricading, is the job of upgradation of existing 110kmph permissible track to make it fit for 160kmph. This job shall be costlier, time consuming and...
more...
-
One more factor, the more important one than barricading, is the job of upgradation of existing 110kmph permissible track to make it fit for 160kmph. This job shall be costlier, time consuming and...
more...