Search Forum
Blog Entry# 2157328
Posted: Feb 09 2017 (15:40)
6 Responses
Last Response: Feb 10 2017 (18:45)
6 Responses
Last Response: Feb 10 2017 (18:45)
IR Affairs
SR/Southern
Kushagra_Sharma^~ 31 news posts
The Railway Ministry has allotted Rs 199.8 crore to modernise the Integral Coach Factory in Chennai as part of a Rs 327-crore project to get the...
1 Posts
IR must speed up its HOG loco project so that the use of generator cars can be eliminated, else speedier LHBfication shall add to financial troubles being faced by IR.
Just HOG is not enough. SLR coaches for LHB is also needed. So it has to be manufactured. And more over, one EOG will be present as back up to HOG system.
I would like the ICF to produce LHB rakes in the original blue livery instead of Red one .
Earlier the livery was red and we got bored of it. When blue livery was introduced it looked attractive, but that too has of late becoming boring. Infact it would be nice to change livery in a decade or two.
Don't worry. Ads will be coming up soon in most of the trains. So livery will keep on changing...