Search Forum
Blog Entry# 2173216
Posted: Feb 21 2017 (17:25)
14 Responses
Last Response: Feb 23 2017 (00:33)
14 Responses
Last Response: Feb 23 2017 (00:33)
Pics of SR E-Locos taken at various places in Bengaluru over past few weeks.
7 Public Posts - Wed Feb 22, 2017
GTL shed is mainly to cater to SCR region and once WADI line becomes electrified fully. SWR needs its own shed to cater to trains in MYS-SBC-YPR-DMM sector. Once SBC-MYS is electrified fully, you need a minimum of 5 to 10 e-locos to cater to SBC-MYS trains itself leave alone the rest. and then come the long distance trains from SBC/MYS/YPR going towards WADI/GNT/BZA via DMM and also SBC-BWT sector. SR will soon run out of locos to lend to SWR as some of the SR lines are also being electrified at a fast pace.
2 Public Posts - Wed Feb 22, 2017
4 Public Posts - Thu Feb 23, 2017