Search Forum
Blog Entry# 2194028
Posted: Mar 11 2017 (14:24)
3 Responses
Last Response: Jul 23 2017 (21:53)
3 Responses
Last Response: Jul 23 2017 (21:53)
kpy station platform 1 is in loop line.So it increase stoppage time of trains. one minute train stoppage consumes 10 to 15 minutes. So please reconstruct a new platform in main line instead of old platform number 1.
1 Public Posts - Sat Mar 11, 2017
If widening PF No.1 to main line over the loop line, we can avoid loop line near to PF No.1.This needs only small change in station control panel and less cost
1 Public Posts - Sun Jul 23, 2017