Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Ranikhet Express - रेगिस्तान में हरियाली

Search Forum
<<prev entry    next entry>>
Blog Entry# 2200164
Posted: Mar 17 2017 (07:09)

5 Responses
Last Response: May 01 2017 (15:32)
Info Update
75394 views
2

Mar 17 2017 (07:09)   31873/Sealdah-Lalgola EMU Passenger | LGL/Lalgola (2 PFs)
Anupam Enosh Sarkar^~
Anupam Enosh Sarkar^~   32882 blog posts
Entry# 2200164            Tags   Past Edits
Conversion of following trains to EMUs w.e.f. 17.03.2017 on trial basis.
Translate to English
Translate to Hindi

48178 views
0

Mar 17 2017 (07:30)
Dj.Railfan1982~
Dj.Railfan1982~   4047 blog posts
Re# 2200164-1              
Why 30 Mins Stop At Krishnanagar ?
Translate to English
Translate to Hindi

50093 views
0

Mar 17 2017 (07:48)
Brahman^~
Brahman^~   10903 blog posts
Re# 2200164-2              
2 eloco is rote se Chutti ho gaya ab kahi or use honge
Translate to English
Translate to Hindi

46685 views
0

May 01 2017 (14:55)
Nirmal   13 blog posts
Re# 2200164-3              
People of Lalgola are not getting benefit of double line. Time from Sealdah is same. Conversion of eloco to EMU may be beneficial to rail and good for short distance passenger, but for those who will be travelling from Sealdah to Lalgola sees no benefit. Saved 30 minutes go to stoppage at Krishnanagar.
Translate to English
Translate to Hindi

46971 views
0

May 01 2017 (15:22)
May_I_have_your_atte~
May_I_have_your_atte~   2863 blog posts
Re# 2200164-4              
Speed in a section depend upon the conditions of the railway tracks not on whether electrification is done or not although electric loco can accelerate much faster and give a better speed but only up to a limit
Translate to English
Translate to Hindi

46641 views
1

May 01 2017 (15:32)
Nirmal   13 blog posts
Re# 2200164-5              
I am talking about 30 min stoppage at Krishnagar. Had it been just 5 min, the train could reach Lalgola 25 mins earlier. After double line each train in Krishnagar Lalgola section is saving around 30 mins from zero crossing time; but it is not reflecting since 1. Timetable is not revised 2. Some train is running slow 3. Some train has been made EMU with 30 minute stoppage at Krishnagar.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy