Search Forum
Blog Entry# 2200164
Posted: Mar 17 2017 (07:09)
5 Responses
Last Response: May 01 2017 (15:32)
5 Responses
Last Response: May 01 2017 (15:32)
Mar 17 2017 (07:09) 31873/Sealdah-Lalgola EMU Passenger | LGL/Lalgola (2 PFs)
Anupam Enosh Sarkar^~
Anupam Enosh Sarkar^~ 32882 blog postsConversion of following trains to EMUs w.e.f. 17.03.2017 on trial basis.
People of Lalgola are not getting benefit of double line. Time from Sealdah is same. Conversion of eloco to EMU may be beneficial to rail and good for short distance passenger, but for those who will be travelling from Sealdah to Lalgola sees no benefit. Saved 30 minutes go to stoppage at Krishnanagar.
Speed in a section depend upon the conditions of the railway tracks not on whether electrification is done or not although electric loco can accelerate much faster and give a better speed but only up to a limit
I am talking about 30 min stoppage at Krishnagar. Had it been just 5 min, the train could reach Lalgola 25 mins earlier. After double line each train in Krishnagar Lalgola section is saving around 30 mins from zero crossing time; but it is not reflecting since 1. Timetable is not revised 2. Some train is running slow 3. Some train has been made EMU with 30 minute stoppage at Krishnagar.