Search Forum
Blog Entry# 2200164
Posted: Mar 17 2017 (07:09)
5 Responses
Last Response: May 01 2017 (15:32)
5 Responses
Last Response: May 01 2017 (15:32)
Mar 17 2017 (07:09) 31873/Sealdah-Lalgola EMU Passenger | LGL/Lalgola (2 PFs)
Anupam Enosh Sarkar^~
Anupam Enosh Sarkar^~ 32882 blog postsConversion of following trains to EMUs w.e.f. 17.03.2017 on trial basis.
2 Public Posts - Fri Mar 17, 2017
2 Public Posts - Mon May 01, 2017
I am talking about 30 min stoppage at Krishnagar. Had it been just 5 min, the train could reach Lalgola 25 mins earlier. After double line each train in Krishnagar Lalgola section is saving around 30 mins from zero crossing time; but it is not reflecting since 1. Timetable is not revised 2. Some train is running slow 3. Some train has been made EMU with 30 minute stoppage at Krishnagar.