Search Forum
Blog Entry# 2247260
Posted: Apr 23 2017 (15:24)
3 Responses
Last Response: Apr 24 2017 (07:03)
3 Responses
Last Response: Apr 24 2017 (07:03)
Apr 23 2017 (15:24) 12562/Swatantrata Senani Express (PT) | JYG/Jaynagar (5 PFs)
brucewayne~
brucewayne~ 2901 blog postsSS again on its delayed track..... started time travelling... courtesy Samastipur Divn.
have a look guys....
have a look guys....
Bhai kal ka scene dkha tha it reachd before @5 MBI and reached jyg aroung 6 they took 11 hours for primary maintenance and let it depart @ 5.30 3 hours late. Hence conclusion is if they themselves are not ready to maintain it's timing than no one can adding, by taking 11 hours also we all know what is cleanness levels in this train i remember on my last travel coackroaches and water spilled everywhere in sleeper coaches mine 3 ac was better but no mercy from coackroaches there too.pathetic work by Spj and JYG.Even if u tweet something to them they never ever reply like other zones i have seen hardly 1 or 2 replies that too to only 1st class travellers.
when MoR was explaning the punctuality ..... he forgot to mention some of the exceptions, one of the default rank hder SS, when this train gets brutally treated and cancelled than for 2-3 days, or you can say atmoat for a week average delay reduces to 2-3-4 hours, than again starts the fun with avg delay of a day. Shameful thing as this one always runs packed. You will hardly get a berth in SS, still NER-NCR-NR trolls it like anything. Poor Senani ruined by extension.
and about tweets you will exactly get a copy paste reply everytime. once a while Samastipur Jn. was being tagged by RmI, and the result SpJ ignored all the tweets.
nothing can be done unless and until zone decides to make it back on tracks like previous one was The Roaring Dragon (Darbhanga-New Delhi SS Sf).
RIP Extension
nothing can be done unless and until zone decides to make it back on tracks like previous one was The Roaring Dragon (Darbhanga-New Delhi SS Sf).
RIP Extension