Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Bandra Garib-Rath - नाम से गरीब, लेकिन मेरे दिल के करीब - Abdul Rehman

Search Forum
<<prev entry    next entry>>
Blog Entry# 2247260
Posted: Apr 23 2017 (15:24)

3 Responses
Last Response: Apr 24 2017 (07:03)
General Travel
9890 views
0

Apr 23 2017 (15:24)   12562/Swatantrata Senani Express (PT) | JYG/Jaynagar (5 PFs)
brucewayne~
brucewayne~   2901 blog posts
Entry# 2247260            Tags   Past Edits
SS again on its delayed track..... started time travelling... courtesy Samastipur Divn.
have a look guys....
Translate to English
Translate to Hindi

5690 views
1

Apr 23 2017 (23:24)
Aman840~
Aman840~   741 blog posts
Re# 2247260-1               Past Edits
Bhai kal ka scene dkha tha it reachd before @5 MBI and reached jyg aroung 6 they took 11 hours for primary maintenance and let it depart @ 5.30 3 hours late. Hence conclusion is if they themselves are not ready to maintain it's timing than no one can adding, by taking 11 hours also we all know what is cleanness levels in this train i remember on my last travel coackroaches and water spilled everywhere in sleeper coaches mine 3 ac was better but no mercy from coackroaches there too.pathetic work by Spj and JYG.Even if u tweet something to them they never ever reply like other zones i have seen hardly 1 or 2 replies that too to only 1st class travellers.
Translate to English
Translate to Hindi

5658 views
0

Apr 24 2017 (07:01)
brucewayne~
brucewayne~   2901 blog posts
Re# 2247260-2              
when MoR was explaning the punctuality ..... he forgot to mention some of the exceptions, one of the default rank hder SS, when this train gets brutally treated and cancelled than for 2-3 days, or you can say atmoat for a week average delay reduces to 2-3-4 hours, than again starts the fun with avg delay of a day. Shameful thing as this one always runs packed. You will hardly get a berth in SS, still NER-NCR-NR trolls it like anything. Poor Senani ruined by extension.
Translate to English
Translate to Hindi

5418 views
1

Apr 24 2017 (07:03)
brucewayne~
brucewayne~   2901 blog posts
Re# 2247260-3              
and about tweets you will exactly get a copy paste reply everytime. once a while Samastipur Jn. was being tagged by RmI, and the result SpJ ignored all the tweets.
nothing can be done unless and until zone decides to make it back on tracks like previous one was The Roaring Dragon (Darbhanga-New Delhi SS Sf).
RIP Extension
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy