Electrification update of MLDT-NJP section....current progress update
Electrification work reached upto Up distance signal of NJP....Up line mai pole install ho gaya bridge tak and single wire bhi lag gaya.....
Down line mai bhi pole bridge tak chala gaya
Hope work complete soon within 1.5 year maximum
Electrification work reached upto Up distance signal of NJP....Up line mai pole install ho gaya bridge tak and single wire bhi lag gaya.....
Down line mai bhi pole bridge tak chala gaya
Hope work complete soon within 1.5 year maximum
1 Posts
It can never be completed by the time stated by you.
PKR-MLDT is expected to be completed by 31st March 2019. We can set a timeframe for KIR-NJP & MLDT- NJP only when electrification works starts at the station's i.e. MLDT & NJP.
NFK & MLDT & NJP station's doesn't have a single pole how can you say that within 1.5 yrs it will be completed.
PKR-MLDT is expected to be completed by 31st March 2019. We can set a timeframe for KIR-NJP & MLDT- NJP only when electrification works starts at the station's i.e. MLDT & NJP.
NFK & MLDT & NJP station's doesn't have a single pole how can you say that within 1.5 yrs it will be completed.
Ap jo bol raha hai o 5 sal pahale tara bat bol raha hai....apne last 1.5 year me kaya kam hua HWH-NJP Section me o ekbar pahale dekh lo....then comment
last 5 year me jo kam hua uska 90%+ work last 1-1.5 years me hua
last 5 year me jo kam hua uska 90%+ work last 1-1.5 years me hua
He is right. Maine kuch din pahle is section Ko dekha. Bahat Kam ho gya hai
Matlab BJP aane se kaam speed up Hua hai..
Kuch v ho par pehle PKR-MLDT ka electrification main hai par iska progress bahut kharab hai. Mera point hai koi v main station par kaam start nai hua jaise NFK/MLDT/NJP aur ye sab station ko electrification karke train chalana 2020 ke pehle to possible nai hai.
Aur KIR-NJP ka v wahi time lag sakta at least 31st March 2020.
Kuch v ho par pehle PKR-MLDT ka electrification main hai par iska progress bahut kharab hai. Mera point hai koi v main station par kaam start nai hua jaise NFK/MLDT/NJP aur ye sab station ko electrification karke train chalana 2020 ke pehle to possible nai hai.
Aur KIR-NJP ka v wahi time lag sakta at least 31st March 2020.