Search Forum
Blog Entry# 247048
Posted: Sep 30 2011 (21:48)
8 Responses
Last Response: Oct 02 2011 (23:29)
8 Responses
Last Response: Oct 02 2011 (23:29)
The proposed 12959 had been assigned 17hrs.45mts. to cover 985Kms. The proposed schedule is given below:
DR-14.35
ADI-22.40
PNU-1.30
SIOB-5.45
GIMB-7.05...
more...
DR-14.35
ADI-22.40
PNU-1.30
SIOB-5.45
GIMB-7.05...
more...
12 Posts
GIMB-16:05-16:25 SIOB-17:18-17:20 ADI-21:25-21:45
gimb to adi 5hr not possible sir atleast 5hr20 min.
gimb to adi 5hr not possible sir atleast 5hr20 min.
Sir Its just 301 kms...
so, 5 hours is fine, being a S/F...
as 19115/19116 takes 5 hours 20 mins.
so, 5 hours is fine, being a S/F...
as 19115/19116 takes 5 hours 20 mins.
sir gimb-siob-adi route is very congested route because of the movement of freight trains (as it provide direct connectivity to kandla port) and 70 percentage of track is single . gimb to siob and viramgam is double line track whereas siob-viramgam is single line track so it very difficult to attain this speed even sayaji nagri or kutch usually arrives adi late.but sir u r proposed train schedule is very good.