Even this Harihara-Kotturu line was opened due to his effort else it would have just continued as it is.... just for Freights. Here is another person with news about HPT passenger demands click here
The other day they had asked for opening the Swamihalli line too for passengers, which during MG era had a passenger from HPT.
The other day they had asked for opening the Swamihalli line too for passengers, which during MG era had a passenger from HPT.
1 high power line takes at least 1 year to shift in various formalities to complete. If there are multiple power lines then it would face heavy delay
But the blame must go to the people who choose such location. They should have avoided high power line as much as possible.
But the blame must go to the people who choose such location. They should have avoided high power line as much as possible.
High power lines are all over the rail lines. Just height will be raised with new poles being erected. Freight is running on this section already. Just station buildings and PFs need to be re-built. That is not done, so using high power lines as an excuse. See point iii - the real reason.
For freight railway are not bothered even if there are high power lines because in freight passenger don't travel.
For running passenger trains all precaution has to be taken .