#Electrification of CR -KR
1. Poles have come up between PEN & KASU
2. Poles have come up between Panvel Outer & Rasayani
3. Work in process near Ratnagiri, Sangameshwar
4....
more...
1. Poles have come up between PEN & KASU
2. Poles have come up between Panvel Outer & Rasayani
3. Work in process near Ratnagiri, Sangameshwar
4....
more...
54 Posts
As of today currently 711 Kms of route kilometers and 1003 kilometers of track length is ready ... please check the details...
Poles are now advancing from Pen station's vicinity to the point where thal bound line diverges.
Also, some poles are visible on the point where thal line diverges on the branch line, but only few poles are there. From there poles are absent till amba river bridge
Also, some poles are visible on the point where thal line diverges on the branch line, but only few poles are there. From there poles are absent till amba river bridge
Complete Poles are now there from Panvel till nagathone (based on your input :P) and from Pen till Thal Siding. Now onlt wiring and construction of substation (wherever they are) is left
there i something coming up shortly before Pen, but it seems too small to be a traction substation, is most probably SSP rather than a full fledged substation. No idea from where the power will be fed from, though I believe Antora substation and Apta Substations of MSEDCL would be used.
there i something coming up shortly before Pen, but it seems too small to be a traction substation, is most probably SSP rather than a full fledged substation. No idea from where the power will be fed from, though I believe Antora substation and Apta Substations of MSEDCL would be used.
Thanks for the info. Gulbarga will be very big division including more KMS above 2000km after all new lines and new Survey lines completion.