Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

ट्रेनों का सफर, ज़िन्दगी का सफर, रेलफैन दोनों में माहिर

Search Forum
<<prev entry    next entry>>
Blog Entry# 3218884
Posted: Mar 19 2018 (18:52)

1 Responses
Last Response: Mar 19 2018 (18:52)
Rail News
6546 views
0

New Facilities/Technology
SR/Southern
Mar 19 2018 (16:59)   KRDCL for Rs 47,000-crore elevated rail corridor across state

^~   11 news posts
Entry# 3218884   News Entry# 331845         Tags   Past Edits
THRISSUR: Kerala Rail Development Corporation Limited (KRDCL) has submitted a feasibility report for the project to construct third and fourth rail lines from Thiruvananthapuram to Kasaragod....

6312 views
0

Mar 19 2018 (18:52)
A2Z~
A2Z~   17505 blog posts
Re# 3218884-1              
* It looks like the Kerala Govt is opting to go for a straighter alignment where the 575 km long current alignment shall be reduced to just 510 KMS. Probably the alignment will go via Alleppy and shall not touch Shoranur.
* Going for a fully elevated corridor with only 180kmph top speed at cost of Rs. 92 crores/km is a bit surprising. Today 180kmph is hardly called a SHS, they could have gone for speed range of 200-250kmph which is optimum speed band SHS. Cost increase drastically for 300 kmph & above HST.
*
...
more...
Mumbai-Ahmedabad 350 kmph max speed HST is costing 192 crore/KM which is pretty high because of the condition that substantial sourcing has to be done from Japan. In case of competitive bidding, it will be much lower than this.
* The current journey of 10-12 hrs between TVC & Kasargod could be brought down to about 4-5 hrs depending on the number of stops, but the land acquisition is going to be very tough task.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy