Search Forum
Blog Entry# 3540053
Posted: Jun 17 2018 (01:47)
8 Responses
Last Response: Aug 23 2018 (19:55)
8 Responses
Last Response: Aug 23 2018 (19:55)
Jun 17 2018 (01:47) 16541/Yesvantpur - Pandharpur Weekly Express | YPR/Yesvantpur Junction (6 PFs)
SingleTraveller^~
SingleTraveller^~ 3249 blog postsDoubling Updates:
-
Tumakuru - Arsikere.
- The work after TK station till Heggere showed no sign of any change.
- After Heggere I could make out that track laying has begun with some gaps...
more...
-
Tumakuru - Arsikere.
- The work after TK station till Heggere showed no sign of any change.
- After Heggere I could make out that track laying has begun with some gaps...
more...
3 Posts
Other sighting:
This HRR/SMET Tri-weekly is a botched up ICE.
1. TT is a mess. The earlier TT was better people said. So it has less preference now.
2. The rake had good no. of GEN coaches. Now I saw the GEN coaches are reduced I think and looks like they are SL type with 2 doors but blue coloured.
3....
more...
This HRR/SMET Tri-weekly is a botched up ICE.
1. TT is a mess. The earlier TT was better people said. So it has less preference now.
2. The rake had good no. of GEN coaches. Now I saw the GEN coaches are reduced I think and looks like they are SL type with 2 doors but blue coloured.
3....
more...
The mess in TT and unwillingness to run trains and deliberately pushing away travellers to other modes - these are things that SWR is good at.
-
A fellow traveller saw me clicking pics of the HRR-KTY puny pass stationed at Harihara's small PF adjacent to PF 1 and said that - that train is the worst.
"It starts at 8:30 and...
more...
-
A fellow traveller saw me clicking pics of the HRR-KTY puny pass stationed at Harihara's small PF adjacent to PF 1 and said that - that train is the worst.
"It starts at 8:30 and...
more...
YPR-HRR ICE struggles in TK-ASK route, it keeps following Chikkamagaluru Pass right from TK till Kadur. But once Kardi-ASK double line is opened, surely it can cover TK-ASK in 2hr. Then again struggles in JRU-DVG due to Gujarat trains and UBL-SBC Pass, so once Tolahunse-JRU and ASK-TK is doubled it should be able to reach DVG by 21:45.
Which station is this ? (In the last few pics taken at night time, the platform looks pretty good with continues shelter, granite flooring and good no. of lights)