Search Forum
Blog Entry# 3801557
Posted: Sep 12 2018 (22:28)
10 Responses
Last Response: Feb 09 2019 (10:38)
10 Responses
Last Response: Feb 09 2019 (10:38)
Tumakuru - Arsikere and Chikkajajur - Yalavigi Doubling updates.
-
-
Tumakuru to Kardi.
-------------------------------
-...
more...
-
-
Tumakuru to Kardi.
-------------------------------
-...
more...
1 Public Posts - Wed Sep 12, 2018
4 Public Posts - Thu Sep 13, 2018
3 Public Posts - Fri Sep 14, 2018
DVG station & city limits can be a major bottleneck for THN-HRR doubling.
Yes total 4 tracks at Sasalu, there are two tracks left of main line of which one will be made main line. And I think they are constructing new PF for that track. So a new 3rd PF track will be constructed along with the existing line for loading ore.
Yes total 4 tracks at Sasalu, there are two tracks left of main line of which one will be made main line. And I think they are constructing new PF for that track. So a new 3rd PF track will be constructed along with the existing line for loading ore.
1 Public Posts - Sat Feb 09, 2019