I was expecting some change at GIN JN since non interlocking work happening from many days ..i saw more than what i excepted ..my last visit here was in march 2016 during GIN -CKBK line inaugural..now lots of changes happened except station building every thing is changed ..
* length of PF increased both sides to 600m (126.2 kmto 126.8km)
*...
more...
* length of PF increased both sides to 600m (126.2 kmto 126.8km)
*...
more...
20 Public Posts - Sun Sep 16, 2018
4 Public Posts - Mon Sep 17, 2018
They should have constructed new PF on other side with increasing no of loop lines. Presently new PF 1 and PF 2 with single track is odd one. If train arrive on this single track then what PF need to to mention as it covers both PF 1 and 2.