I was expecting some change at GIN JN since non interlocking work happening from many days ..i saw more than what i excepted ..my last visit here was in march 2016 during GIN -CKBK line inaugural..now lots of changes happened except station building every thing is changed ..
* length of PF increased both sides to 600m (126.2 kmto 126.8km)
*...
more...
* length of PF increased both sides to 600m (126.2 kmto 126.8km)
*...
more...
33 Posts
Horrible, what is the need for double discharge platform here.
There is some factory at Ginigera, where does that track divert ??
There is some factory at Ginigera, where does that track divert ??
Ya factory ..towards hpt/ggvt just before gangavathi line diverts
This station is junction point for new Ginigera Raichur line but it's situated on Hubli Guntakal Main line
They should have constructed new PF on other side with increasing no of loop lines. Presently new PF 1 and PF 2 with single track is odd one. If train arrive on this single track then what PF need to to mention as it covers both PF 1 and 2.