I was expecting some change at GIN JN since non interlocking work happening from many days ..i saw more than what i excepted ..my last visit here was in march 2016 during GIN -CKBK line inaugural..now lots of changes happened except station building every thing is changed ..
* length of PF increased both sides to 600m (126.2 kmto 126.8km)
*...
more...
* length of PF increased both sides to 600m (126.2 kmto 126.8km)
*...
more...
20 Public Posts - Sun Sep 16, 2018
1 Public Posts - Mon Sep 17, 2018
Horrible, what is the need for double discharge platform here.
There is some factory at Ginigera, where does that track divert ??
There is some factory at Ginigera, where does that track divert ??