Search Forum
Blog Entry# 38879
Posted: May 10 2010 (19:31)
4 Responses
Last Response: May 11 2010 (23:02)
4 Responses
Last Response: May 11 2010 (23:02)
How to update the train time table for 0909A/0910A spl train for BDTS to Bhuj ( 3 services on each direction) ?
@ Note that train will run on 14-26-29th May 2010 from Mumbai Central and in return direction on 15-27-30th May 2010 from Bhuj. But each service departure timing and arrival timings is different. !!!
Here is the WR circular :-
In...
more...
@ Note that train will run on 14-26-29th May 2010 from Mumbai Central and in return direction on 15-27-30th May 2010 from Bhuj. But each service departure timing and arrival timings is different. !!!
Here is the WR circular :-
In...
more...
I can only hazard a guess because I don't have WR Time table. Also I don't why Bhuj is having these specials.. religious reasons perhaps. In which case one would have to see the Panchang !
Two guesses::
The trains have been so timed as to make use of slots available on those dates between trains already scheduled, which include availability of power (locos), rakes, platform berthing, pit lines for inspection and so on.
And/Or...
more...
Two guesses::
The trains have been so timed as to make use of slots available on those dates between trains already scheduled, which include availability of power (locos), rakes, platform berthing, pit lines for inspection and so on.
And/Or...
more...
Your posting carries your views (on Why .. introduction of spl trains on this route) rather than reply to the original blogpost raised by me. The schedule of these train timings have been published in the WR circular and the same details are posted here.
For your information,
i) There is a need and already a pending demand with WR Headquarter office, for one additional regular train on this route as there is heavy traffic throughout the year on this route.
ii)...
more...
For your information,
i) There is a need and already a pending demand with WR Headquarter office, for one additional regular train on this route as there is heavy traffic throughout the year on this route.
ii)...
more...
I really appreciate Mr. Kapadia for your views. This section really needed an additional train and I just wish that WR extends the train for the month of June too. It is a very happy moment for me that Bhuj has got a special train, after a long time. Mostly special trains terminate at Gandhidham only. Hope that people of Kutch make optimum utilization of the facility extended to them. One thing in particular intrigued me is the fact that this summer special has not been given stops at Adipur & Anjar. I thought WR might not have mentioned the same in their circular but I also checked at IRCTC website, there also it does not show stops at the mentioned stations in its route. I really don't understand this. Though Anjar and Adipur are not much farther from Gandhidham, but when the train is passing through these stations why...
more...
more...