Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

संपूर्ण क्रान्ति है तो जहां है

Search Forum
<<prev entry    next entry>>
Blog Entry# 4046462
Posted: Nov 27 2018 (13:31)

4 Responses
Last Response: Dec 02 2018 (23:13)
General Travel
2870 views
1

Nov 27 2018 (13:31)   JMP/Jamalpur Junction (4 PFs)
shishir~
shishir~   134 blog posts
Entry# 4046462            Tags  
If the electrification is done till JMP in March 2019 how should railway utilize it. Changing locos at JMP will take time and it has only 3 platforms. I personally think that d-locos+e-locos should be attached with train from BGP itself for trains and d-loco should be detached at JMP. it will save time. But this can happen only in few trains in delhi direction. If Katni-Manikpur section is electified by then then this patter should follow in those trains also.
Other wise will have to wait for e-locos till JMP-BGP electrification is complete.
Translate to English
Translate to Hindi

1838 views
0

Nov 27 2018 (23:03)
AmishKumar^~
AmishKumar^~   12525 blog posts
Re# 4046462-1              
I think no passing trains given eloco from jmp, only after cmpt^n upto bgp maybe elocos run.
Translate to English
Translate to Hindi

1 Public Posts - Wed Nov 28, 2018

2 Public Posts - Sun Dec 02, 2018
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy