Search Forum
Blog Entry# 4108683
Posted: Dec 15 2018 (15:57)
2 Responses
Last Response: Feb 25 2019 (22:28)
2 Responses
Last Response: Feb 25 2019 (22:28)
Despite being electrified for close to a month now, the line still operates with diesel locos. My past two freight spottings here have been with EMD, which is how the line has been operating for quite some time.
however on my last spotting I did see a WAG 7 on the line standing alone at the junction point where Line towards Dharamtar port diverges, making it the first E loco spotting here :P
.
Image...
more...
however on my last spotting I did see a WAG 7 on the line standing alone at the junction point where Line towards Dharamtar port diverges, making it the first E loco spotting here :P
.
Image...
more...
It will most probably be constructed in a village called as Chondhi, not much far from the only manned LC on this Line.
The line terminates inside a Chemical Fertilizer factory, so definitely not going towards Thal. The station will therefore be close to 8 kms from the main
town.
The line terminates inside a Chemical Fertilizer factory, so definitely not going towards Thal. The station will therefore be close to 8 kms from the main
town.