Search Forum
Blog Entry# 424541
Posted: May 14 2012 (00:15)
35 Responses
Last Response: Jun 02 2012 (20:22)
35 Responses
Last Response: Jun 02 2012 (20:22)
May 14 2012 (00:15) 12041/Howrah - New Jalpaiguri Shatabdi Express | NJP/New Jalpaiguri Junction (8 PFs)
MailguardSG25~
MailguardSG25~ 24054 blog postsTalks are already going on in this website about LHB-iasation of HWH RNC Shatabdi Exp & subsequently allotting the ICF Rake to HWH-NJP Proposed Shatabdi.I have two questions:-
(i)Will the Shatabdi Run full?I think not many people of the region,through which the Shatabdi is expected to run,can afford a Costly Ride of Shatabdi.
(ii)Is it really possible to Run a Shatabdi b/w 567 km within 16-17 Hrs including the Return trip,where it'll be hauled by a Diesel Engine & the route b/w NFK & SNT,has lot of Engineering Problems,Presently the fastest Darjeeling Mail...
more...
(i)Will the Shatabdi Run full?I think not many people of the region,through which the Shatabdi is expected to run,can afford a Costly Ride of Shatabdi.
(ii)Is it really possible to Run a Shatabdi b/w 567 km within 16-17 Hrs including the Return trip,where it'll be hauled by a Diesel Engine & the route b/w NFK & SNT,has lot of Engineering Problems,Presently the fastest Darjeeling Mail...
more...
9 Public Posts - Mon May 14, 2012
The shatabdi will leave HWH in the morning for sure, as for the rail line between BHP-MLDT, its true to have problems, but RPH-STH is better, think IR should first finish with all their blocks and upgradation and then start this train with a WDP4 it can get required acceleration.
20 Public Posts - Mon May 14, 2012
3 Public Posts - Tue May 15, 2012
1 Public Posts - Wed May 16, 2012
1 Public Posts - Sat Jun 02, 2012