Here i present the full doubling update of BZA BVRT
1. Bridge on BUDAMERU which was immediately after bza parllel to BZA VSKP main line
2.bed works done with optical boxes curving out to GDV BVRT NDD LOOP
3. immediately after curve there was need of 2 bridges side by side work was still at starting phase
4,5....
more...
1. Bridge on BUDAMERU which was immediately after bza parllel to BZA VSKP main line
2.bed works done with optical boxes curving out to GDV BVRT NDD LOOP
3. immediately after curve there was need of 2 bridges side by side work was still at starting phase
4,5....
more...