Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

IRI - चाहे कितने भी हों मतभेद, फिर भी हम परिवार एक - Dr. Abhishek Rai

Search Forum
<<prev entry    next entry>>
Blog Entry# 4335795
Posted: Jun 05 2019 (21:03)

5 Responses
Last Response: Jun 09 2019 (11:33)
General Travel
9787 views
1

Jun 05 2019 (21:03)   12807/Samata Express | VSKP/Visakhapatnam Junction (8 PFs) | VSKP/WAP-7
RVBRao~
RVBRao~   320 blog posts
Entry# 4335795            Tags   Past Edits
Is this running with E-E Electric Loco, without any LC at R?
After commissioning of TIG-R FEDL, ECoR/SCoR needs to finally give this prestigious train the importance it deserves by implementing the following changes:
1) LHB with HOG & Antyodaya GS coaches, LHB SLR instead of EOGs to take care of UR pax
2) Should be speeded up by atleast 30-45 Mins between VSKP-R.
...
more...
Overall minimum of 120 Mins speedup required between VSKP-NZM by giving higher MPS between NGP-NZM.
3) Removal of atleast 10 smaller/redundant halts of the total 19 between VSKP-R. This will be done after introduction of new intercity between VSKP-DURG/KRBA in both directions with similar timings and more halts, which will be actually helpful for the commuting crowd in this route and have higher capacity. Of course it'll also solve the overcrowding issue in this train and ensure comfort for majority of long distance passengers.

Translate to English
Translate to Hindi

6510 views
0

Jun 06 2019 (21:47)
TheLucifer
TheLucifer   6796 blog posts
Re# 4335795-1              
Bro when will TIG-R FEDL section going to commissioned???
Translate to English
Translate to Hindi

5914 views
0

Jun 06 2019 (22:07)
VivekVardhan
VivekVardhan   128 blog posts
Re# 4335795-2               Past Edits
Yes , Exactly as per the information, R-TIG is not fully Double lined & also Electrification of Loop Lines are not done between R-TIG section...….//
Translate to English
Translate to Hindi

6213 views
1

Jun 08 2019 (10:20)
RVBRao~
RVBRao~   320 blog posts
Re# 4335795-3              
Last stretch of Electric line is pending for CRS approval I think. Doubling looks like it'll take one more year! I wrote about what should be done after FEDL commissioning. Even with partially commissioned double line, if Samata gets E-E Electric (VSKP WAP7) , run time can be cut by atleast 30-45 Mins.
Translate to English
Translate to Hindi

5947 views
0

Jun 08 2019 (10:28)
SaurabhDubey^~
SaurabhDubey^~   30383 blog posts
Re# 4335795-4               Past Edits
Electrification work in yards and stations not completed.. So no train plying with eloco in raipur tig section ...possibly after July - august it will start.
Speed up and halt removal can not be done until fedl work completes...
Translate to English
Translate to Hindi

5756 views
0

Jun 09 2019 (11:33)
TheLucifer
TheLucifer   6796 blog posts
Re# 4335795-5              
Running time can be cut by 2 hours atleast.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy