Search Forum
Blog Entry# 4409216
Posted: Aug 24 2019 (08:39)
4 Responses
Last Response: Aug 25 2019 (20:56)
4 Responses
Last Response: Aug 25 2019 (20:56)
On 22.08.2019, Adra division achieved 100% punctuality in passenger trains and was ranked 1st on IR and achieved 96.88% in Mail/Exp category and was ranked 2nd over IR.
Good. 🤗
SER should invest in upgrading signalling system of some sections in the division for easier handling. CKP and KGP have automatic signalling in their major sections.
SER should invest in upgrading signalling system of some sections in the division for easier handling. CKP and KGP have automatic signalling in their major sections.
3 Public Posts - Sun Aug 25, 2019