I think the Akola Khandwa gauge conversion project pendency is the created problem.
If Akola Khandwa gauge conversion project will complete then it'll be shortest connectivity for the South (East /West) and North (East/West ).
Due to pending work on this route most of the train diverted via Badnera (Amravati). Which is not natural.
If Akola Khandwa gauge conversion project will complete then it'll be shortest connectivity for the South (East /West) and North (East/West ).
Due to pending work on this route most of the train diverted via Badnera (Amravati). Which is not natural.
GC for AII-COR-RTM-IND-KNW-AK-PAU was proposed in 1997 1st. Then The Rajput & Malwa REgions Royal Families staged demonstration against that decision. Otherwise by 2010 AII-PAU BG line would had been operational.