Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

संपूर्ण क्रान्ति है तो जहां है

Search Forum
<<prev entry    next entry>>
Blog Entry# 4728244
Posted: Sep 29 2020 (12:48)

2 Responses
Last Response: Oct 01 2020 (15:59)
Travel Question
22366 views
0

Sep 29 2020 (12:48)   12517/Kolkata - Guwahati Garib Rath Express
subh.pesit
subh.pesit   206 blog posts
Entry# 4728244            Tags  
Shouldn't it run E2E with an E-loco since the entire journey route is electrified. i mean, IR can save lot of diesel.
Translate to English
Translate to Hindi

18233 views
0

Sep 29 2020 (12:57)guest
Re# 4728244-1               Past Edits
Only till NJP the route is electrified and even NJP has begun Loco Change only in Covid times so before that even Barsoi NJP was a diesel route. NJP to GHY is electrification is going on. So whenever it will restart it will run with E-loco till NJP and in future End to End once GHY is electrified.
Translate to English
Translate to Hindi

1 Public Posts - Thu Oct 01, 2020
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy