Search Forum
Blog Entry# 4773500
Posted: Nov 10 2020 (09:54)
16 Responses
Last Response: Dec 31 2020 (12:43)
16 Responses
Last Response: Dec 31 2020 (12:43)
Nov 10 2020 (09:54) 02002/New Delhi - Habibganj Shatabdi Special | BINA/Bina Junction (6 PFs) | GZB/WAP-5/30140
AnshPateriya~
AnshPateriya~ 433 blog posts#30140 Ghaziabad WAP 5 leading 02002 New Delhi - Habibganj Shatabdi covid 19 spl curving through Bina Jn.
11 Posts
If Railway wants this trsin to be successful, then it must USE 2 RAKES instead of One.
Reason of lower partonage is that the Train reaches NDLS TOO LATE in Night and it LEAVES TOO EARLY in Morning. The Same rake has to travel both ways in 1 day, so, uncomfortable timings.
If...
more...
Reason of lower partonage is that the Train reaches NDLS TOO LATE in Night and it LEAVES TOO EARLY in Morning. The Same rake has to travel both ways in 1 day, so, uncomfortable timings.
If...
more...
Please check the Map of NDLS in this site.
Route is parallel atleast for some time after leaving NDLS, might be that they might use different tracks.
There are 6 am departures at...
more...
Route is parallel atleast for some time after leaving NDLS, might be that they might use different tracks.
There are 6 am departures at...
more...
VB departs from PF16 while Shatabdi departs from PF1. Both tracks are different and there is no issue in parallel departures from New Delhi.
Now HBJ Shatabdi won't be able to depart NDLS at 6am as TVC Rajdhani has to depart NZM at 6 15 am.