Search Forum
Blog Entry# 5244795
Posted: Mar 16 2022 (20:30)
6 Responses
Last Response: Mar 17 2022 (08:14)
6 Responses
Last Response: Mar 17 2022 (08:14)
Route of Jaipur Udaipur and Jaipur Daulatpur Chowk trains was completely electrified. Still NWR dont have guts to give e loco😠😡 why? Then what is the use of electrification and wasting crores of rupees for this? Also there are still many trains that were running in diesel loco eventhough the section was newly electrified. Another example is ashram express not giving e loco due to an silly reason by Delhi division is "neutral section". Why they dont have change platform for arrival to solve this issue? Even Yoga express also passing via Delhi jn and getting e loco. also there are plenty of WAP7 to haul passenger trains.
List of trains which routes are completely or partly electrified but running...
more...
List of trains which routes are completely or partly electrified but running...
more...
5 Public Posts - Wed Mar 16, 2022
Let's clear out some points here.
- No wastage of money with electrification because the Diesel cost is still saved by using Elocos on freight trains which can burn a lot of diesel while idling on a loop line waiting to get overtaken by a train or waiting for clearance.
- NWR does not have their own Eloco shed to allot locos to those trains. Right now ABR staff is getting trained with some WAP4s and hopefully once that is sorted out TKD/GZB/BRC or any other shed will start transferring locos to them....
more...
- No wastage of money with electrification because the Diesel cost is still saved by using Elocos on freight trains which can burn a lot of diesel while idling on a loop line waiting to get overtaken by a train or waiting for clearance.
- NWR does not have their own Eloco shed to allot locos to those trains. Right now ABR staff is getting trained with some WAP4s and hopefully once that is sorted out TKD/GZB/BRC or any other shed will start transferring locos to them....
more...