Apr 02 2022 (16:18) 47151/Umdanagar - Lingampalli MMTS | SC/Secunderabad Junction (10 PFs)
Sheikkaleemmaulali~
Sheikkaleemmaulali~ 806 blog postsThe sad and pathetic state of suburban travel(mmts) in Hyderabad
*See the below image for example
The old train was running with 1hr 30min for a distance of 38km (25kmph)
The new time table which shows further delay by 20 min(38km in 2hr ~20kmph)
Plus...
more...
*See the below image for example
The old train was running with 1hr 30min for a distance of 38km (25kmph)
The new time table which shows further delay by 20 min(38km in 2hr ~20kmph)
Plus...
more...
10 Posts
It's not impossible, IR has done this kind of exercise when they expanded the Aishbagh Lucknow City line under the Rakabganj bridge to set as per the norms of BG.
But it amount of land in question here is higher and it will take solid amount of time and effort + financial aspects. Not to mention the support from the State govt.
But it amount of land in question here is higher and it will take solid amount of time and effort + financial aspects. Not to mention the support from the State govt.
33 km stretch between BZA & GNT takes around one hour to cover even after doubling and electrification.
In my post i already mentioned Begumpet railway station to be totally eliminated
Instead necklace road (for Nampally bound trains) and sanjevayya park station for secunderabad bound trains can be used both stations can reclaim hussain sagar land
Or nature hospital station (both Nampally and sc bound trains) land can be bought from Hyderabad public school
And also if speed is good the...
more...
Instead necklace road (for Nampally bound trains) and sanjevayya park station for secunderabad bound trains can be used both stations can reclaim hussain sagar land
Or nature hospital station (both Nampally and sc bound trains) land can be bought from Hyderabad public school
And also if speed is good the...
more...
Opposite secunderabad railway station at bhoiguda chilalguda side there were railway quarters which are totally demolished and staying vacant
The total measuring area is 1km long and 0.5 km width
Parking and station building can be made and platform need to connected using foot over bridges
The total measuring area is 1km long and 0.5 km width
Parking and station building can be made and platform need to connected using foot over bridges
Sc Begumpet quadrapling can be highly costly and not be needed in near future also
But Begumpet lpi quadrapling is very much needed
But Begumpet lpi quadrapling is very much needed