Search Forum
Blog Entry# 5370229
Posted: Jun 07 2022 (12:37)
15 Responses
Last Response: Jun 08 2022 (16:43)
15 Responses
Last Response: Jun 08 2022 (16:43)
New Facilities/Technology
SWR/South Western
sachinature~ 1664 news posts
Work on all the infrastructure of the first air-conditioned railway terminal of south India was completed by the beginning of last year
More...
More...
10 Posts
True. All trains in SBC BGM route and SBC BJP run jam packed. Even KSK too runs with WL in UBL SBC section.
I travelled by RC just 3days back between SBC-GKK, booked it 10days before the journey date when it was RAC130 expecting it to confirm since there were 10days and also running with SE1. Yet on the day of journey it was RAC105 and after chart preparation also it was RAC only.
Same with Panchaganga too, too difficult to get confirmed tickets and on top of it has too less coaches.
Same with Panchaganga too, too difficult to get confirmed tickets and on top of it has too less coaches.
First let us get some regular SF trains. VB, HS, Duronto and other fancy trains should be additional ones and should not be the only train in the route.
When we do not have even one SF, providing VB is like inflicting more pain.
When we do not have even one SF, providing VB is like inflicting more pain.
A Tirupati train Something like TPTY 0700 KPD 0900 TPTY 1300. SBC DEP1500 KPD 1900 KPD 2115. Trailing or ahead of Brindavan express will share the ever crowded brindavan express
Ideally there should be trains from
SMVB to BGM via UBL,
SMVB to BJP via GTL BAY GDG
SMVB to BIDR Via GTL RC KLBG
These...
more...
SMVB to BGM via UBL,
SMVB to BJP via GTL BAY GDG
SMVB to BIDR Via GTL RC KLBG
These...
more...