Search Forum
Blog Entry# 5768136
Posted: Jul 03 2023 (22:41)
44 Responses
Last Response: Jul 07 2023 (16:04)
44 Responses
Last Response: Jul 07 2023 (16:04)
Lot of pics and news are showing up saying that new BZA MAS VB is Going to start is that required or can bza fill 8 VB coaches at now pinakini has 3 CC Coaches they may shift to vb
We can't expect people booking in ont's like circar,navjeevan,gt,tn exp will go for vb same way janshatabdi has afternoon dep at bza
Only bza and ogl need to fill this vb
NLR...
more...
We can't expect people booking in ont's like circar,navjeevan,gt,tn exp will go for vb same way janshatabdi has afternoon dep at bza
Only bza and ogl need to fill this vb
NLR...
more...
39 Posts
Uday should start at 8 am from vizag. If not stop like Annavaram, NDD need in vskp - bza side. From BZA it's always full so no issues
Yep Annavaram NDD is needed as JB doesn't at ndd Annavaram gets devotees so they can be added, maybe running via bvrt is also good option if they speed up trains in that section
30 to 40 min extra time can be added for 27 km
In return it can be preponed so it will reach vskp bit ahead of vb
30 to 40 min extra time can be added for 27 km
In return it can be preponed so it will reach vskp bit ahead of vb
It can start a bit early so vb ot can be avoided as well let's see I don't think they will change anything even stops,gnt division should lobby for it
The dep time from Vskp needs to be changed to 600 ahead of Janmabhoomi. As ACC of JB are down to 1 from 3 coaches those seats filled will be filled in Uday. In BZA Vskp there is no need to change timings only thing us to run on time as they have a gap.of 35min at Vskp. Problem is Chennai/Tirupati Vskp /BBS ecpress which runs late and obstructing the path of Uday.