Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

ಮೈಸೂರು - ವಾರಣಾಸಿ ಎಕ್ಸ್‌ಪ್ರೆಸ್: ಕಾವೇರಿ ಮತ್ತು ಗಂಗಾ ನದಿಗಳ ಸಂಪರ್ಕ ಸೇತುವೆ - Vishwanath Joshi

Search Forum
<<prev entry    next entry>>
Blog Entry# 5869069
Posted: Nov 02 2023 (00:37)

6 Responses
Last Response: Nov 03 2023 (12:21)
Info Update
23079 views
4

Nov 02 2023 (00:37)   KSJ/Kasganj Junction (5 PFs)
PrakharYadav^~
PrakharYadav^~   12843 blog posts
Entry# 5869069            Tags  
2 compliments
Useful Agree
#1 Is it possible to have 'wye' / bypass @ Kasganj for movement trains from CNB to BRY without reversal @ KSJ ?

#2 What is the minimum curvature required for a rail track to curve ?
Translate to English
Translate to Hindi

1 Posts

8345 views
0

Nov 02 2023 (11:16)
G_VINAYAK~
G_VINAYAK~   1726 blog posts
Re# 5869069-2              
It's look like land is available there, so IR can plan this and run trains like which present in MG era. It will surely benefit for everyone.
Translate to English
Translate to Hindi

8358 views
1

Nov 02 2023 (11:21)
PrakharYadav^~
PrakharYadav^~   12843 blog posts
Re# 5869069-3              
no no. MG era mei loop tha due to which reversal was not required. PFA
Translate to English
Translate to Hindi

8261 views
1

Nov 02 2023 (11:26)
G_VINAYAK~
G_VINAYAK~   1726 blog posts
Re# 5869069-4              
1 compliments
Useful:No worries
I didn't know this. Trains stop there long time so I assume there are LR by looking scenario after BG conversion, thanks for this info. But looking map of today this loop land has been encroached and there are no free space available. Sad reality.
Translate to English
Translate to Hindi

7965 views
1

Nov 02 2023 (11:29)
PrakharYadav^~
PrakharYadav^~   12843 blog posts
Re# 5869069-5              
1 compliments
Useful
During British Era,
Initially Bareilly to Mathura straight route existed (without reversal @ KSJ) but trains for CNB has to take reversal.
however later on loop was made, and hence trains to CNB were able to proceed without reversal but trains to MTJ had to take reversal now.

but
...
more...
when GC was done, loop was abandoned which also helped KSJ road traffic as level crossings didnt went down anymore but now if trains to CNB were introduced if wud require reversal.

there have been multiple news which say loop wud b restored, but dont know the ground reality.

Translate to English
Translate to Hindi

6124 views
0

Nov 03 2023 (12:21)
ManishSharma~
ManishSharma~   283 blog posts
Re# 5869069-6              
Only BG tracks have to be laid down, land of ruined lines is still available. After loop re-construction, might be beneficial for railway to run more trains passing through this section.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy