Search Forum
Blog Entry# 5869069
Posted: Nov 02 2023 (00:37)
6 Responses
Last Response: Nov 03 2023 (12:21)
6 Responses
Last Response: Nov 03 2023 (12:21)
#1 Is it possible to have 'wye' / bypass @ Kasganj for movement trains from CNB to BRY without reversal @ KSJ ?
#2 What is the minimum curvature required for a rail track to curve ?
#2 What is the minimum curvature required for a rail track to curve ?
5 Public Posts - Thu Nov 02, 2023
Only BG tracks have to be laid down, land of ruined lines is still available. After loop re-construction, might be beneficial for railway to run more trains passing through this section.