Search Forum
Blog Entry# 5974165
Posted: Feb 19 (20:52)
9 Responses
Last Response: Feb 21 (08:05)
9 Responses
Last Response: Feb 21 (08:05)
Feb 19 (20:52) 18047/Shalimar - Vasco-da-Gama Amaravati Express (PT) | GTL/Guntakal Junction (7 PFs)
LHB_for_18047~
LHB_for_18047~ 10693 blog postsSuch a big slack this train has between GNT to GTL. It easily recovered a 2 hrs delay and arrived GTL 15 minutes BT.
Also because of the slip attachment and detachment at GTL in addition to loco change it had to take a long 50 minutes halt. If slip is cancelled the loco change can be completed in much less time or shifted to UBL.
In the end it reached VSG just 5 minutes late.
This...
more...
Also because of the slip attachment and detachment at GTL in addition to loco change it had to take a long 50 minutes halt. If slip is cancelled the loco change can be completed in much less time or shifted to UBL.
In the end it reached VSG just 5 minutes late.
This...
more...
4 Public Posts - Mon Feb 19, 2024
Dude ...if SER demands like coach increase or speed increase in SWR, then surely Amaravati will become the next Coromandel and Goa exp......
And 10 SL coaches are sufficient, yes but if reduced then serious complications will happen.
Post slip removal and LHBfication, the rake composition should be
Loco.SLRD.Gen.Gen.S1.S2.S3.S4.S5.S6.S7.S8.S9.S10.B1.B2.B3.B4.B5.A1.SLR.
And 10 SL coaches are sufficient, yes but if reduced then serious complications will happen.
Post slip removal and LHBfication, the rake composition should be
Loco.SLRD.Gen.Gen.S1.S2.S3.S4.S5.S6.S7.S8.S9.S10.B1.B2.B3.B4.B5.A1.SLR.
2 Public Posts - Mon Feb 19, 2024
1 Public Posts - Tue Feb 20, 2024
1 Public Posts - Wed Feb 21, 2024