Search Forum
Blog Entry# 6001431
Posted: Mar 17 (14:44)
37 Responses
Last Response: Mar 27 (19:42)
37 Responses
Last Response: Mar 27 (19:42)
Already Lalbagh runs with a delay everyday. Adding to the woes, now VB is overtaking it every day and delay is getting added. Need to revise the TT ASAP.
21 Public Posts - Thu Mar 21, 2024
14 Public Posts - Fri Mar 22, 2024
1 Public Posts - Sat Mar 23, 2024
Brindavan start from MAS at 0620 SBC 1200 MYS 1430. Can go to Salem MYS 1500 SBC 1730 SA 2130. Next day, can start from Salem at 0530 SBC 0930 MYS 1200. Start as Brindavan at 1230 SBC 1500 SBC 2100.
Will act as a direct day time link between MAS and MYS. Also can share the bulk load in SBC KJM BWT TPT route in evening/ morning. Can reduce load from many long distance trains
Will act as a direct day time link between MAS and MYS. Also can share the bulk load in SBC KJM BWT TPT route in evening/ morning. Can reduce load from many long distance trains