Search Forum
Blog Entry# 6034889
Posted: Apr 18 (11:46)
7 Responses
Last Response: Apr 19 (17:04)
7 Responses
Last Response: Apr 19 (17:04)
1 Public Posts - Thu Apr 18, 2024
In one of the PDFs named statusofprojectssurvey, in point iv on pg 12, they have mentioned in red as
'Due to land constraint at Malad (East),Cut connections for all existing 5 lines (4 suburban & 1 mail express) is required to be done at both Malad South and Malad North.'
What does it mean?
'Due to land constraint at Malad (East),Cut connections for all existing 5 lines (4 suburban & 1 mail express) is required to be done at both Malad South and Malad North.'
What does it mean?
3 Public Posts - Thu Apr 18, 2024
2 Public Posts - Fri Apr 19, 2024