Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

नहीं कोई गम, रेलवे से हैं हम - Aman

Search Forum
<<prev entry    next entry>>
Blog Entry# 726818
Posted: Apr 18 2013 (18:36)

3 Responses
Last Response: Apr 24 2013 (13:47)
General Travel
3037 views
1
Apr 18 2013 (18:36)   12444/Anand Vihar Terminal - Haldia SF Express
 
guest   0 blog posts
Entry# 726818            Tags  
atleast one more 3ac must be attached to the train
Translate to English
Translate to Hindi

1444 views
0

Apr 19 2013 (19:57)
AvradipTMZ^~
AvradipTMZ^~   3939 blog posts
Re# 726818-1              
I agree, not only 3A, the railways should attach some 2A coaches also to make it a proper and regular superfast express. The only question is whether the single existing platform at Haldia (HLZ) can accommodate that much long rake or not. Already this train is 15 coaches long. Any member from Haldia can clarify it. I have a doubt how the railways are doing the rake cleaning and maintenance also. There was no concept of "yard" there at Haldia, so far I have seen it 2 years back. There are many things to do, increase the platform length, make some pit/side lines, make proper arrangements for rake cleaning etc etc.
Translate to English
Translate to Hindi

1 Public Posts - Tue Apr 23, 2013

1 Public Posts - Wed Apr 24, 2013
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy