Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

पश्चिम रेलवे की शान, पश्चिम सुपरफास्ट एक्सप्रेस मेरी जान - Abdul Rehman

Search Forum
<<prev entry    next entry>>
Blog Entry# 900127
Posted: Nov 08 2013 (20:32)

30 Responses
Last Response: Nov 12 2013 (07:40)
2 Followers
Travel Question
14828 views
10

Nov 08 2013 (20:32)  
 
guest   6387 blog posts
Entry# 900127               Past Edits
from recent posts it has been noticed that "hwh wap4" of eastern railway has been used consistently with hwh cstm duronto for its high speed(max speed potential 130km/hr as sources claimed)......... as compared to src(santragachi wap4----- max speed 110 km/hr).
[depicted in picture 1 uploaded by me power of 12262 hwh cstm drnt standing at pf 22 of howrah]
i think if ser allows wap4 with a speed potential 130km/hr to ply in its railway territory then why not wap7!!!!!!!! a fully sophisticated loco with a max speed of 130-140 km/hr with
...
more...
a superb pick up/accelaration capacity as per the situation.......................
[depicted in picture 2 uploaded by me the cabin and loco pilots of wap 7 which hauls tvc nzm rajdhani from kota to hazrat nizamuddin]
ser should use wap7(the white demon and the most successful loco presently in india for aristocrat trains like rajdhani and duronto) only for the following three non stop trains:
12262/12261 hwh cstm duronto
12222/12221 hwh pune duronto
12245/12246 hwh ypr duronto
please share views..........................

Translate to English
Translate to Hindi

5 Public Posts - Fri Nov 08, 2013

7 Public Posts - Sat Nov 09, 2013

7 Public Posts - Sun Nov 10, 2013

8 Public Posts - Mon Nov 11, 2013

1 Public Posts - Tue Nov 12, 2013

3008 views
0

Nov 12 2013 (06:14)
G_I_P_R^~
G_I_P_R^~   7211 blog posts
Re# 900127-29              
But for high speed runs we need articulated train sets. The number of wheels on vestibuled or coupled coaches is high and will cause excessive friction. and in articulated coaches, one cannot separate a coach that so easily. The entire rake will have to be sent n for maintainance even if the problen exists in only one coach. AFAIK our infrastructure and processes will not be ready for this even after 20 years
Translate to English
Translate to Hindi

1 Public Posts - Tue Nov 12, 2013
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy