Full Site Search  
Thu Jun 29, 2017 12:50:22 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

<<prev entry    next entry>>
Blog Entry# 935240  
Posted: Dec 15 2013 (11:16)

6 Responses
Last Response: Dec 15 2013 (11:30)
  
General Travel
0 Followers
1443 views
Dec 15 2013 (11:16)   11301/Udyan Express
 

narayanmahesh   21 blog posts
Entry# 935240            Tags   Past Edits
Hi, could anyone tell me why all south bound trains, including Udyan express, have diesel locos between Mumbai and Pune, when electrification is available?
Diesel doesn't come anywhere close to electric as far as riding comfort and speed is concerned. Plus, I would assume there are environmental considerations with the ghats.
I see north-bound trains running on electric locos though. Is there a reason?

1 posts - Sun Dec 15, 2013

  
1243 views
Dec 15 2013 (11:22)
divjyotahluwalia   171 blog posts   31 correct pred (61% accurate)
Re# 935240-2            Tags   Past Edits
The issue is that beyond Pune there is no electrification. So there is no point in doing a loco change after 150 kms at Pune for trains heading south. Many trains have diesel locos in order to save time and operational constraints. Eg- Many times uttar sampark kranti and jammu rajdhani have diesel locos though route uptill jallandhar is electrified. Even Pooja exp from Ajmer to Jammu has deisel loco inspite more than half its route being electrified.

  
1203 views
Dec 15 2013 (11:23)
narayanmahesh   21 blog posts
Re# 935240-3            Tags   Past Edits
As I mentioned, I see north-bound trains running on electric. They must be changing at Igatpuri or Manmad too right? So whats wrong in changing at Pune?

  
1238 views
Dec 15 2013 (11:24)
narayanmahesh   21 blog posts
Re# 935240-4            Tags   Past Edits
Ah ok I see

  
1095 views
Dec 15 2013 (11:25)
Western Railway°°°   1213 blog posts   500 correct pred (71% accurate)
Re# 935240-5            Tags   Past Edits
any idea, how much time will take for the rest of the section between pune-bangalore to get electrified..? :)

  
1070 views
Dec 15 2013 (11:30)
Begins Falls Rises ™~   21453 blog posts   1207 correct pred (63% accurate)
Re# 935240-6            Tags   Past Edits
No idea. wait for some more time i.e years.
LTT - KYN voltage change itself is under pending, so u can imagine how much time will it take for the entire Pune - WADI/GTL to get energized.
Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.