Search Forum
Blog Entry# 947428
Posted: Dec 27 2013 (12:43)
4 Responses
Last Response: Dec 27 2013 (18:55)
4 Responses
Last Response: Dec 27 2013 (18:55)
Other News
SR/Southern
MSRINIVASANME~ 1141 news posts
Southern Railway ,Madurai division proposed to run Passenger /Express Electric trains in the Dindugal-Madurai section from 1/2013 and then Madurai-Virudhunagar section.Madurai division send the trial run...
read more... DINDUGAL-MADURAI-VIRUDHUNAGAR SECTION ELECTRIFIED
Madurai Division should also send the proposal for the removal of the Roof of the Old un-utilized and less height over bridge passage in the Madurai Junction from the main station to the Arasaradi side through all the Rail Line in the platforms . CRS mentioned that this over bridges less roof height is not suitable for the safety of the passenger train operation through Madurai Junction station.
Good news waiting seee ED,RpM,AJJ monsters in madurai....Sir WDP never retires it hauls Madurai-sct,punalur passenger,duronto trains