Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

RailFans never grow old

Search Forum
Filters:
Page#    421612 Blog Entries  next>>
General Travel
35879 views
3

Jun 12 (15:01)   12801/Purushottam Express (PT)
piy07~
piy07~   201 blog posts
Entry# 6093040            Tags   Past Edits
6 compliments
Disagree:Big blunder by railways!!!!!! Great Disagree:SHAME SHAME Disagree:Degrading a premium connection !!! Disagree:I got no words for such a decision. Disagree:Kis Khushi Mai kar rahe hai ye
Big News ( as per update from sources )
1.Train no of 12801/02 Purushottam Superfast Express will be changed to 18401/18402 W.E.F 01.07.24

2.Train no. of 12892/91 PURI - BGY will be changed to 18404/18403 W.E.F 01.07.24.
Translate to English
Translate to Hindi

37 Posts

12054 views
1

Jun 12 (23:20)
Suri~
Suri~   7927 blog posts
Re# 6093040-38               Past Edits
1 compliments
Great:95% u r right
Only feasible reason seems for all these renumbering drama is providing more halts, increasing travel time, reducing AC coaches and running overnight full AC Vande bharat Sleeper trains with these 12xxx numbers with lesser halts.
Translate to English
Translate to Hindi

11229 views
4

Yesterday (00:02)
DMail^~
DMail^~   6991 blog posts
Re# 6093040-39              
There is a speculation that new minimum avg speed required for superfast category is 65kmph.
Translate to English
Translate to Hindi

8352 views
2

Yesterday (05:13)
deepak.yerr~
deepak.yerr~   6290 blog posts
Re# 6093040-40              
If it's then it's great. But IR will lose lot of revenue in form of SF surge and each train contributes min of Rs 30,000 per day or Rs 1cr per year and taking entire IR network wil be around Rs 500-1000cr on conservative basis. Next year they will raise base fares and reservation fee to recover.
Translate to English
Translate to Hindi

5455 views
1

Yesterday (07:10)
UTTARANDHRARAILSEVA~
UTTARANDHRARAILSEVA~   1877 blog posts
Re# 6093040-41              
1 compliments
Agree
Is this the aim of MISSION RAFTAR ? Degradation of PURUSHOTTAM EXP is very bad.
BBS VSKP INTERCITY EXP is SF.
Very bad administration
Translate to English
Translate to Hindi

30 views
0

Today (14:09)
Tapan Sharma^~   1562 blog posts
Re# 6093040-42              
Just a thought I might be wrong however is this circular legit? The fonts used header and inside table , they are different and also the word in sentence 'Status of Train changed from Sperfast to Non-Super fast." "Sperfast"? We did have typos before but never saw in such cases . The first table entirely has the different font, new abbreviations being used whereas in the second table for passenger trains are being reverted to old numbers they too don't have any remarks, Indentation and alignment is not properly made. We cannot see any signature of railway personnel too. We just got circulars from NFR and ECOR?
Translate to English
Translate to Hindi
General Travel
331 views
0

Today (14:01)   15901/Lumding - Tinsukia Express (UnReserved) | LMG/Lumding Junction (5 PFs)
Kumaon_Tiger^~
Kumaon_Tiger^~   40253 blog posts
Entry# 6094932            Tags  
Train No. 15901/15902 (Lumding-Tinsukia-Lumding) will run in Demu Service
with revised Train Number as 75601/75602.
Translate to English
Translate to Hindi
General Travel
4054 views
0

Today (11:53)  
Sakthivel~
Sakthivel~   2661 blog posts
Entry# 6094804               Past Edits
5 compliments
Disagree:stupid comparsion Disagree:Ye kya faaltu baat pakad liye bhai? Disagree:Kuch bhi 😂😂 Disagree:Kuch bhi...invalid comparision Agree
click here

Condition of Railways in Tanzania, East Africa.
All tracks fenced properly. No trespassing issues. No animal and human trespassing there. Every RF should watch this video.
Trains and stations are
...
more...
neatly maintained and No issue of "Bolo Zuban Kesari" there. (I am not taking about Bullet trains or European trains here).

Our IR is even much older than Tanzanian Railways, however still we have to improve ourselves a lot.
We people still believing in the words of politicians and many Railway officers have Politically oriented railway unions like SRMU, DREU, NRMU, etc etc. Also everywhere bringing caste and religion card everywhere even in IR. That's why development schemes on IR were delayed a lot.

Still no crowd management, non automated doors, ticketless travelling etc etc and so on in IR. Although Vande Bharat system introduced by IR is appreciable, still passengers complaining of leg space issues in Chair car coaches by some RFs. Also recently Lucknow Dehradun VB was occupied illegally by UR passengers. The crowd management is pretty worst here all due to increased population levels and demand of Shramik and Mazdoor log all over the country and also unequal share of income. Still our Per Capita Income is not upto mark although we have Adanis, Ambanis etc although Gross Domestic Product is increasing a lot.

I am seeing everywhere this "North South divide" often because there is an common stereotype is often North based passengers travel and occupy all seats and causing overcrowding. But same it is happening in South also well. All due to regional politicians whom want to secure vote bank but doing nothing to this solution.

We fining fines from Ticketless travellers, but ever IR thinked about installing Ticketing system like in Metro stations? Or able to take tickets even boarding train in case of UR trains although GPS won't allow to do so in UTS app.

We want to improve current safety measures,cleanliness and prevention of trespassing first here. Also an standard rule should be there for all. Then after improving we can think about Bullet trains, high speed trains etc.

PS: I am not an supporter of any political party, political agenda here.

For your views....

Translate to English
Translate to Hindi

6 Posts

2946 views
1

Today (12:25)
IWANTTOBERLYMINISTER4EVER~
IWANTTOBERLYMINISTER4EVER~   46653 blog posts
Re# 6094804-7              
1 compliments
Agree
Right. But we have to keep some more things also in mind
1. Low Infrastructure which is still under developing. (Once track laid make it Double line to avoid extra budget for steel for doubling later as prices are increasing day by day and if track is free use for Freight by laying connecting lines)
2. Empty posts in IR which we have to keep in mind due to over time work of employees
3.
...
more...
Political Interference in all aspects and immediate intermediate halts for Expresses also which i s hurdle for back trains

Translate to English
Translate to Hindi

2718 views
2

Today (12:27)
amit1982railfan   88 blog posts
Re# 6094804-8               Past Edits
1 compliments
Useful
Tanzania rail total 2600kms length
Indian rail total 68700 kms approx length
I don’t say you can’t compare but atleast compare with someone similar to India in rail traffic density. Have some sense and kindly come with proper facts before spilling such thoughts out of your mind.
Translate to English
Translate to Hindi

2564 views
1

Today (12:30)
IWANTTOBERLYMINISTER4EVER~
IWANTTOBERLYMINISTER4EVER~   46653 blog posts
Re# 6094804-9              
1 compliments
Useful
One more thing Tanzania Just stared their expansion after so many years with china debt. Don't know how many years they can keep this flow.
Translate to English
Translate to Hindi

2135 views
3

Today (12:38)
ER_PRAGADESH_SK_NGT^~
ER_PRAGADESH_SK_NGT^~   17760 blog posts
Re# 6094804-10              
3 compliments
Agree Agree Agree
The way Tanzania developed its railway is good. We should appreciate them first. Rather than disagreeing That I first agree we need to improve IR. as mentioned by other persons we cant compare scale of things here. The way railways done in a country depend on demography and geography. Even though US has 2L kms of tracks they not even run 1% of IR run in any day and We have countries which have High speed trains like Japan China France Germany. Countries like Swiss follows excellent examples for public transit. India is very diverse we should aknowledge that and we must understand our weakness and plan accordingly. If India can pave highways which competes EU and US , Railway development is also possible. We should acknowledge the time and pattern needed before we fall for blaming games.
Translate to English
Translate to Hindi

953 views
1

Today (13:39)
deepak.yerr~
deepak.yerr~   6290 blog posts
Re# 6094804-11              
1 compliments
Thanks
Agree with you most of the points are valid and need to be addressed in future when so called hype of Amrit Bharat Stations. People here can't digest the truth and ground reality but it's fact.
Translate to English
Translate to Hindi
General Travel
1612 views
2

Today (13:28)   14864/Marudhar Express (Via Sultanpur) (PT) | JP/Jaipur Junction (8 PFs)
VIVEKEXPRESS^~
VIVEKEXPRESS^~   40421 blog posts
Entry# 6094904            Tags  
1 compliments
Great:Nice captures..👍

4 pics

Jodhpur - varanasi Marudhar Express standing on PF 1.
Translate to English
Translate to Hindi
General Travel
1593 views
1

Today (13:26)   12956/Jaipur - Mumbai Central SF Express (PT) | JP/Jaipur Junction (8 PFs)
VIVEKEXPRESS^~
VIVEKEXPRESS^~   40421 blog posts
Entry# 6094900            Tags  

4 pics

Jaipur - Mumbai central ♥️ standing on PF no 4
Translate to English
Translate to Hindi
Page#    421612 Blog Entries  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy