Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Eat-Sleep-Railfanning 🔄 Repeat - Shankar Mehani

Search Forum
Filters:
Page#    421569 Blog Entries  <<prev  next>>
General Travel
8330 views
1

Today (00:57)   03423/Bhagalpur - Haridwar Special Fare Summer Special | BGP/Bhagalpur Junction (6 PFs)
ItzAbhi^~
ItzAbhi^~   2109 blog posts
Entry# 6096571            Tags   Past Edits
03423/Bhagalpur - Haridwar Express - 106% occupancy.

03413/Malda - New Delhi Express - 105% occupancy.

These trains can be regularised by ER.
For
...
more...
your views.

Translate to English
Translate to Hindi

2375 views
0

Today (09:48)
HARSHR.^~
HARSHR.^~   6299 blog posts
Re# 6096571-1              
Special train ko regular karne mh inko 10-12 saal lag jaate hai
Translate to English
Translate to Hindi

2354 views
0

Today (09:50)
ItzAbhi^~
ItzAbhi^~   2109 blog posts
Re# 6096571-2              
Bilkul sahi bole 😂
Translate to English
Translate to Hindi

895 views
1

Today (10:40)
HBR^~
HBR^~   2116 blog posts
Re# 6096571-3              
Agartala habibganj is an example.....
Translate to English
Translate to Hindi

559 views
0

Today (10:53)
WAP7NFRMLDT~
WAP7NFRMLDT~   924 blog posts
Re# 6096571-4              
Sirf ek trip se kam nahi chalega . Min 5 trip analyze karna hoga .
Btw 03423 , 03413, 03007 should be regular as all of its trips are 80% full
Translate to English
Translate to Hindi
General Travel
694 views
0

Today (10:48)   12377/Padatik Express (PT) | MYGD/Maynaguri Road (2 PFs)
MoynaFromMoynaguri
MoynaFromMoynaguri   7 blog posts
Entry# 6096741            Tags   Past Edits
click here

উত্তরবঙ্গে আরও ভালো রেল যোগাযোগের জন্য, স্বাধীনতা-পূর্ব যুগের বেঙ্গল-ডুয়ার্স রেলওয়ে ব্যবস্থা করা উচিত।
Translate to English
Translate to Hindi
General Travel
34855 views
28

★★★
Yesterday (05:11)   12611/M.G.R. Chennai Central - Hazrat Nizamuddin Garib Rath Express (PT)
TAGEERUANUBHARADWAJ^
TAGEERUANUBHARADWAJ^   15251 blog posts
Entry# 6095565            Tags  
6 compliments
Great Great Great Great:finally converted. Great Great
LHB

MAS - NZM GR

Pic Courtesy:. Ashish from BZA
Translate to English
Translate to Hindi

19 Posts

8256 views
0

Today (01:52)
VIVEKEXPRESS^~
VIVEKEXPRESS^~   40639 blog posts
Re# 6095565-20              
Andaman Express / Gomti sagar Exp
Rake composition should be changed
These trains needs :-
EoG -HA1 - A1 - B1 - B2 - B3 - B4 -B5 - PC - S6 - S5 - S4 - S3 - S2 - S1 - GS - GS - GS -SLRD 1 HCPV **
...
more...

20 coach Rake lhb rake

Translate to English
Translate to Hindi

5135 views
0

Today (07:07)
TAGEERUANUBHARADWAJ^
TAGEERUANUBHARADWAJ^   15251 blog posts
Re# 6095565-21              
BTW

Marshaling GS coaches in both ends. Keeping at one end is dumbest thing.
Translate to English
Translate to Hindi

3750 views
0

Today (07:52)
SaurabhDubey^~
SaurabhDubey^~   30278 blog posts
Re# 6095565-22               Past Edits
Why not to ASR or to jat via asr as mas/bza not having direct connectivity to asr
Translate to English
Translate to Hindi

2951 views
0

Today (08:14)
Vipankumar~
Vipankumar~   1962 blog posts
Re# 6095565-23              
Earlier digital board was introduced but some times coach alterations or any other reason it not worked properly.
Translate to English
Translate to Hindi

1634 views
0

Today (10:13)
TAGEERUANUBHARADWAJ^
TAGEERUANUBHARADWAJ^   15251 blog posts
Re# 6095565-24              
Haa

Probably disconnected in workshop.
Translate to English
Translate to Hindi
General Travel
4219 views
1

Yesterday (19:24)   ASN/Asansol Junction (7 PFs)
Rail12345
Rail12345   2331 blog posts
Entry# 6096321            Tags   Past Edits
Tender for Vande Bharat maintainance facility at Asansol New Coaching depot
Translate to English
Translate to Hindi

1458 views
0

Today (10:03)
Rail12345
Rail12345   2331 blog posts
Re# 6096321-1              
Maybe the new proposed VB will be maintained at Asansol
Translate to English
Translate to Hindi
General Travel
14366 views
2

Jun 14 (10:04)   JMP/Jamalpur Junction (4 PFs)
LHBfied1307172SUPEREXPRES~
LHBfied1307172SUPEREXPRES~   284 blog posts
Entry# 6094706            Tags   Past Edits
1 compliments
Useful
Latest update about doubling of JMP-MGR-KGG rail line including new rail bridge beside Shri Krishna Setu....
Translate to English
Translate to Hindi

9755 views
0

Jun 14 (11:51)
ItzAbhi^~
ItzAbhi^~   2109 blog posts
Re# 6094706-1              
सिर्फ रेलवे पुल बनेगा। नई पुल मे सड़क मार्ग नही रहेगा।
Translate to English
Translate to Hindi

4485 views
0

Yesterday (22:48)
Vikramshila~
Vikramshila~   212 blog posts
Re# 6094706-2              
The current bridge is wide enough to hold 2 tracks, why do they need to build a new bridge.
Munger Ganga bridge is wider than Patna Digha bridge that is 2 lanes.
Translate to English
Translate to Hindi

2043 views
1

Today (09:42)
ItzAbhi^~
ItzAbhi^~   2109 blog posts
Re# 6094706-3              
Railway track is fitted in middle of bridge. For doubling in same bridge, current railway track must be re arranged to either left or right in bridge to create some space for second track
Translate to English
Translate to Hindi
Page#    421569 Blog Entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy