Search Forum
Filters:
Today (00:48) 07355/SSS Hubballi - Rameswaram Special Fare Special | UBL/SSS Hubballi Junction (Hubli) (8 PFs) | UBL/WAP-7/39355
sivaprakashofficial^~
sivaprakashofficial^~ 6790 blog posts1 Posts
Jun 08 (10:39) LKO/Lucknow Charbagh NR (9 PFs)
ANKITSRIVASTAVA12._^~
ANKITSRIVASTAVA12._^~ 2925 blog posts𝐑𝐞𝐧𝐮𝐦𝐛𝐞𝐫𝐢𝐧𝐠 𝐨𝐟 𝐍𝐑 𝐩𝐚𝐬𝐬𝐞𝐧𝐠𝐞𝐫 𝐭𝐫𝐚𝐢𝐧𝐬 𝐰𝐢𝐭𝐡 𝐫𝐞𝐠𝐮𝐥𝐚𝐫 𝐧𝐮𝐦𝐛𝐞𝐫𝐬 𝐰𝐞𝐟 𝟎𝟏/𝟎𝟕/𝟐𝟎𝟐𝟒 𝐚𝐬 𝐰𝐚𝐬 𝐫𝐮𝐧𝐧𝐢𝐧𝐠 𝐝𝐮𝐫𝐢𝐧𝐠 𝐩𝐫𝐞-𝐂𝐎𝐕𝐈𝐃 𝐩𝐞𝐫𝐢𝐨𝐝.
【𝐒𝐞𝐫𝐢𝐚𝐥 𝐍𝐮𝐦𝐛𝐞𝐫 𝟏𝟐𝟓 से 𝟏𝟒𝟐 देखें.】
【𝐒𝐞𝐫𝐢𝐚𝐥 𝐍𝐮𝐦𝐛𝐞𝐫 𝟒𝟒𝟐 से 𝟒𝟓𝟓 देखें.】
【𝐒𝐞𝐫𝐢𝐚𝐥 𝐍𝐮𝐦𝐛𝐞𝐫 𝟏𝟐𝟓 से 𝟏𝟒𝟐 देखें.】
【𝐒𝐞𝐫𝐢𝐚𝐥 𝐍𝐮𝐦𝐛𝐞𝐫 𝟒𝟒𝟐 से 𝟒𝟓𝟓 देखें.】
442 se 455 i don't see any kind of error, 125-142 pertaining division is misprinted
दैनिक जागरण @ 𝐋𝐮𝐜𝐤𝐧𝐨𝐰 𝐈 𝐧𝐞𝐱𝐭, 𝟏𝟒 𝐉𝐮𝐧𝐞 𝟐𝟎𝟐𝟒, 𝐩𝐚𝐠𝐞 𝟒
अमर उजाला @ 𝐋𝐮𝐜𝐤𝐧𝐨𝐰, 𝟏𝟒 𝐉𝐮𝐧𝐞 𝟐𝟎𝟐𝟒, 𝐩𝐚𝐠𝐞 𝟐
अमर उजाला @ 𝐋𝐮𝐜𝐤𝐧𝐨𝐰, 𝟏𝟒 𝐉𝐮𝐧𝐞 𝟐𝟎𝟐𝟒, 𝐩𝐚𝐠𝐞 𝟐
Yesterday (05:11) 12611/M.G.R. Chennai Central - Hazrat Nizamuddin Garib Rath Express (PT)
TAGEERUANUBHARADWAJ^
TAGEERUANUBHARADWAJ^ 15251 blog posts18 Posts
Andaman Express / Gomti sagar Exp
Rake composition should be changed
These trains needs :-
EoG -HA1 - A1 - B1 - B2 - B3 - B4 -B5 - PC - S6 - S5 - S4 - S3 - S2 - S1 - GS - GS - GS -SLRD 1 HCPV **
...
more...
Rake composition should be changed
These trains needs :-
EoG -HA1 - A1 - B1 - B2 - B3 - B4 -B5 - PC - S6 - S5 - S4 - S3 - S2 - S1 - GS - GS - GS -SLRD 1 HCPV **
...
more...
BTW
Marshaling GS coaches in both ends. Keeping at one end is dumbest thing.
Marshaling GS coaches in both ends. Keeping at one end is dumbest thing.
Why not to ASR or to jat via asr as mas/bza not having direct connectivity to asr
Earlier digital board was introduced but some times coach alterations or any other reason it not worked properly.
Hon'ble PM event on 20th June
1) Flagging off of Chennai - Nagercoil Vande Bharat Express.
2) Foundation stone laying for train set (Vande Bharat) maintenance depot at BBQ, Chennai
...
more...
1) Flagging off of Chennai - Nagercoil Vande Bharat Express.
2) Foundation stone laying for train set (Vande Bharat) maintenance depot at BBQ, Chennai
...
more...
7 Posts
Sir, SMVT will need atleast 1 VB being given the world's first completely air-conditioned terminal (which is really not that air-conditioned 😑)... so I'm not that sure if they'll do that... also only 5 PFs at BNC have been constructed and already 2 have been used (1 for CBE BNC CBE VB and another as pitline for some other trains)... another one will be coming soon i.e. MDU BLR (maybe BNC or SMVT or SBC)... assuming terminating at BNC then although PFs r available, KLBG VB won't have PF for it to terminate and depart.... if they pull this off then great.... let's wait and find out..👍👍
Harsha bro, could you explain the 2nd point of the event??? As in, r they planning to have a VB shed exclusively for VB maintenance?? Is there no space in the shed for VBs???
Actually ig they are making a dedicated shed for vb's at bbq to have proper maintenance of vb as day by day no. of vb's are increasing from Chennai so this shed will be very useful.
Today (04:52) 20889/Howrah - Tirupati Humsafar Express | BZA/Vijayawada Junction (10 PFs)
Train.ka.diwana~
Train.ka.diwana~ 1595 blog posts7 Years to Howrah-Tirupati Humsafar.
In frame Vijayawada/BZA WAP7 #30612 with 20889 Howrah-Tirupati/HWH-TPTY Humsafar at Vijayawada/BZA junction
In frame Vijayawada/BZA WAP7 #30612 with 20889 Howrah-Tirupati/HWH-TPTY Humsafar at Vijayawada/BZA junction